Service
Source-removal cleaning,
filmed before and after.
Supply, return and fresh-air ducts, plus AHU and FCU coils.
Specification
Scope, stated plainly.
Source-removal cleaning of supply, return and fresh-air ducts in office towers, hospitals, hotels, airports, pharma plants and data centres. Negative Pressure Machines, rotary brushes, Air Whip and contact vacuuming, matched to each duct type and contamination profile. Pre- and post-clean RoboCam video. Methods aligned with NADCA's published standards.
NADCA-aligned methods
| Item | Scope |
|---|---|
| Supply · Return · Fresh-air ducts | Included |
| AHU & FCU coil cleaning | Included |
| Diffuser, grille and VCD cleaning | Included |
| Microbial remediation & sanitisation | Included |
| Photo + video evidence | Included |
Equipment
The right tool for each duct.
- K-01
Negative Pressure Machine
- K-02
Rotary brush system
- K-03
Air Whip
- K-04
Contact vacuuming
- K-05
RoboCam Inspection Video System
Methods aligned with NADCA's published standards
What you receive
Evidence you can file, not just an invoice.
Pre-clean and post-clean RoboCam video
Photo report of every cleaned section
Job Completion Certificate
Sectors servedOffice towers · Hospitals · Hotels · Airports · Pharma plants · Data centres
Before and after
The same duct, before and after.
Open the photo report
AHU supply plenum
AHU plenum and cooling coil, dust and lint removed.

Office return duct
Office-tower return duct, settled dust extracted.

Cleanroom supply duct
Pharma-plant spiral supply duct, dust purged.
Representative imagery. Project photos on request.
How it runs
Seven documented steps, every site.
- 01Site survey & scope of work
- 02Method statement, containment & safety
- 03Pre-clean RoboCam inspection
- 04Mechanical cleaning: NPM, rotary brush & Air Whip
- 05AHU, coils, grilles & kitchen hood cleaning
- 06Access ports & microbial sanitisation
- 07Post-clean RoboCam, photo report & Job Completion Certificate
Scope it
Scope your AC system in a minute.
Total tonnage of the system; it is on the AC nameplates or the design drawings.
Airflow is estimated at 400 CFM per ton (TR), the common rule of thumb for comfort cooling. The survey measures the real figure.
Enter the tonnage to see the airflow and what the clean covers.
The inspection measures the duct runs and access points, then you receive a written scope and quote. Plus GST.
Questions
About this service.
Book a free duct inspection.
Tell us the building and the ducts. We reply with a written scope and a quote.
Mon – Sat · 09:30 – 19:00 · Emergency & night-shift cleans on request



