Before the day
After the survey you receive a written method statement and risk assessment. It sets out the electrical isolation, working at height and confined-space steps for your site.
What we need from you
01
Power & water supply
Standard site power and a water point within reasonable reach of the work zone.
02
Engineering team access
Your engineering staff on call to remove and replace fans, dampers, VAVs and grilles where needed.
03
Isolation & tag-out
All fans to be turned off, isolated and tagged out before cleaning begins, for crew safety.
04
Waste disposal point
A designated collection point for grease, rags, plastic and debris removed during cleaning.
05
Scaffolding or hydraulic ladder
Provided by you where grilles or high-level components require working at height.
06
24-gauge GI sheet
Supplied by you to re-fix the access ports we cut into your ducts.
Sites outside Mumbai
Food and accommodation for on-site crew is arranged by the client for sites outside Mumbai.
On the day
Fans are turned off and tagged out before work starts. Plastic containment and negative pressure keep dust and grease inside the work zone, away from occupied space.